Energy & Infrastructure Brief · October 19, 2026 · 4 pages

Bankable

Beyond Hydro: Nine years of pipeline; one deal near close.

Cover of Bankable
97.4%Share of FY2024/25 generation from hydropower
5.6%Non-hydro share of installed capacity in 2025
18%Estimated FY2024/25 wind fleet capacity factor
300 MWCapacity of the Aysha 1 wind IPP

What this brief covers.

Ethiopia's power grid is overwhelmingly renewable but remains concentrated in hydropower. This brief examines whether the country's wind, solar and geothermal pipeline is commercially bankable, using Aysha 1, fleet performance, financing structures and foreign-currency payment risk as the central tests.

Source base

Ethiopian Electric Power; Ministry of Water and Energy; World Bank Mission 300; African Development Bank; Energy Outlook 2025; Ethiopia NDC 3.0; IRENA; Kenya EPRA; PIDG; IMF; Ethiopian News Agency; Federal Register

See the full source notes and data-period qualifications in the PDF

The evidence behind the headline.

Publication-specific findings from the full brief. Claims and source details can be checked in the PDF below.

01

Why diversify an already clean grid?

Hydropower supplied 97.4% of FY2024/25 generation. The case for wind, solar and geothermal is therefore resilience against hydrological and climate risk, rather than basic decarbonisation.

02

What is holding the pipeline back?

Nine years after Ethiopia's PPP framework, Aysha 1 remains the first utility-scale renewable project approaching financial close. Tariff, currency and dispatch-risk terms are still not public.

03

What must investors test?

Ethiopia's operating wind fleet produced an estimated 18% capacity factor in FY2024/25, while Aysha 1 and Aysha II imply about 45%. Lenders need evidence on grid availability, curtailment, turbine performance and payment security.

What to watch next.

The full brief distinguishes observed signals from InfoPlate's interpretation. These are forward tests, not predictions of a completed outcome.

  1. Aysha 1 financial close and disclosure of its tariff and currency terms
  2. Confirmation of the Corbetti and Tulu Moye geothermal restarts
  3. Progress on the REI4P procurement pipeline and EEP's FY2026/27 capacity target

Read the full brief.

For the best reading experience on a phone, open the brief in a new tab or save a copy.

Preview not loading? Open the PDF directly.

Tamene, Edosa. “Bankable.” InfoPlate Media and Consulting, October 19, 2026.